Ask five GTA contractors what a whole-home renovation costs and you will get five numbers that differ by six figures. That is because "renovation" covers everything from paint-and-floors to taking a house back to the studs. This guide splits it into three honest tiers, shows the 2026 room-by-room numbers behind them, and explains where the money actually goes.
| Tier | Per Sq Ft | 2,000 Sq Ft Home | What You Get |
|---|---|---|---|
| Cosmetic Refresh | $40 – $75 | $80K – $150K | Flooring, paint, trim, doors, lighting, hardware — layout untouched |
| Mid-Range Renovation | $100 – $160 | $200K – $320K | New kitchen, 2–3 bathrooms, flooring throughout, some wall changes |
| Gut / Full Remodel | $180 – $275+ | $360K+ | Back to studs: new plumbing, electrical, HVAC, insulation, layout redesign |
These are installed prices covering material and labour, before 13% HST. Older homes trend to the top of each range because of what hides behind the walls — more on that below.
| Room / Scope | 2026 Range | Notes |
|---|---|---|
| Kitchen | $25K – $45K mid-range | $10K–$20K refresh, $50K–$75K+ custom — see our kitchen page |
| Bathroom (each) | $15K – $30K full remodel | $8K–$15K refresh, $30K–$50K+ luxury — see our bathroom page |
| Basement finish | $60 – $90 / sq ft | $35–$55 basic, $90–$140+ legal apartment — see our basement page |
| Flooring (main level) | $4 – $15 / sq ft | LVP to solid hardwood — full breakdown in our flooring guide |
| Interior painting | $3 – $6 / sq ft of floor area | Whole 2,000 sq ft home: $6K–$12K including ceilings and trim |
| Stairs (13 steps) | $1.3K – $2.6K+ | Hardwood recap; first thing buyers and guests see |
This order is also why phasing a renovation over two or three years costs more in total — trades remobilize, floors get protected and re-protected, and finished rooms get dusted by the next phase. If the budget allows, one continuous project is cheaper per square foot.
Homes built before the 1980s routinely hide knob-and-tube or aluminum wiring, galvanized or cast-iron plumbing, zero insulation in exterior walls, and moisture damage around original windows. None of it is visible on a walkthrough; all of it surfaces on demo day. This is why we tell every client to hold 10–15% contingency — not as padding, but because in a 40-year-old Brampton or Mississauga home, something behind the drywall will want attention.
In Brampton the strongest renovation ROI is not cosmetic at all — it is the legal basement apartment. A $60K–$120K legal second unit renting around $1,800/month pays itself back in 3–5 years and raises the property's value as an income-generating asset. If you are renovating the whole home anyway, roughing in the basement plumbing and separate entrance during the main project is dramatically cheaper than retrofitting later.
Cosmetic refresh $40–$75/sq ft, mid-range $100–$160, gut renovation $180–$275+. A 2,000 sq ft detached: roughly $80K–$150K, $200K–$320K, or $360K+ respectively.
Systems and structure, then kitchen and bathrooms, then flooring and paint last. Cosmetic work done before systems work gets destroyed and paid for twice.
Main floor: 4–8 weeks. Whole home mid-range: 8–16 weeks. Gut renovation with structural changes: 4–6 months including permits.
10–15%. Older GTA homes reveal wiring, plumbing and moisture surprises on demo day; the contingency keeps the schedule alive.
All at once, per square foot. Phasing means trades remobilize each time and finished areas need protecting from the next phase. Phase only if cash flow demands it.
Free walkthrough across Brampton, Mississauga & the GTA. Line-item quote — trim the scope, not the quality.
☎ (647) 771-0806 Request Online →