Ask five GTA contractors what a whole-home renovation costs and you will get five numbers that differ by six figures. That is because "renovation" covers everything from paint-and-floors to taking a house back to the studs. This guide splits it into three honest tiers, shows the 2026 room-by-room numbers behind them, and explains where the money actually goes.

The Three Tiers: 2026 Per Square Foot

TierPer Sq Ft2,000 Sq Ft HomeWhat You Get
Cosmetic Refresh$40 – $75$80K – $150KFlooring, paint, trim, doors, lighting, hardware — layout untouched
Mid-Range Renovation$100 – $160$200K – $320KNew kitchen, 2–3 bathrooms, flooring throughout, some wall changes
Gut / Full Remodel$180 – $275+$360K+Back to studs: new plumbing, electrical, HVAC, insulation, layout redesign

These are installed prices covering material and labour, before 13% HST. Older homes trend to the top of each range because of what hides behind the walls — more on that below.

Room-by-Room: Where the Budget Goes

Room / Scope2026 RangeNotes
Kitchen$25K – $45K mid-range$10K–$20K refresh, $50K–$75K+ custom — see our kitchen page
Bathroom (each)$15K – $30K full remodel$8K–$15K refresh, $30K–$50K+ luxury — see our bathroom page
Basement finish$60 – $90 / sq ft$35–$55 basic, $90–$140+ legal apartment — see our basement page
Flooring (main level)$4 – $15 / sq ftLVP to solid hardwood — full breakdown in our flooring guide
Interior painting$3 – $6 / sq ft of floor areaWhole 2,000 sq ft home: $6K–$12K including ceilings and trim
Stairs (13 steps)$1.3K – $2.6K+Hardwood recap; first thing buyers and guests see
Rule of thumb for mid-range budgets: the kitchen takes about 30% of the total, bathrooms about 20%, flooring and paint about 20%, and the remaining 30% covers trim, doors, lighting, drywall repairs and the contingency. If a quote gives the kitchen 50% of the budget, the rest of the house will feel unfinished.

The Order of Operations (Do Not Skip This)

  1. Systems and structure first. Roof, foundation cracks, plumbing stacks, panel upgrades, HVAC. Nothing cosmetic survives a leak.
  2. Layout changes. Wall removals and beam work happen while the house is already open.
  3. Kitchen and bathrooms. The rooms with plumbing and the biggest resale return.
  4. Flooring, trim, paint. Last, so other trades do not scratch and dent the finish work.

This order is also why phasing a renovation over two or three years costs more in total — trades remobilize, floors get protected and re-protected, and finished rooms get dusted by the next phase. If the budget allows, one continuous project is cheaper per square foot.

Older GTA Homes: The Hidden Costs

Homes built before the 1980s routinely hide knob-and-tube or aluminum wiring, galvanized or cast-iron plumbing, zero insulation in exterior walls, and moisture damage around original windows. None of it is visible on a walkthrough; all of it surfaces on demo day. This is why we tell every client to hold 10–15% contingency — not as padding, but because in a 40-year-old Brampton or Mississauga home, something behind the drywall will want attention.

Where to Save, Where to Spend

Turning Renovation Into Income

In Brampton the strongest renovation ROI is not cosmetic at all — it is the legal basement apartment. A $60K–$120K legal second unit renting around $1,800/month pays itself back in 3–5 years and raises the property's value as an income-generating asset. If you are renovating the whole home anyway, roughing in the basement plumbing and separate entrance during the main project is dramatically cheaper than retrofitting later.

Recent Whole-Home Work

Open-concept main floor renovation in Brampton Oak staircase renovation in a Brampton whole-home remodel Before and after staircase renovation in Brampton

How Raj Renos Runs a Whole-Home Project

  1. Free walkthrough and scope. We measure, photograph and price the house room by room — you see exactly what each space costs.
  2. Fixed line-item quote. Kitchen, bathrooms, flooring, paint and stairs each priced separately, so you can trim scope without guessing.
  3. One crew, one schedule. Licensed trades for plumbing, electrical and HVAC, sequenced so finished work stays finished.

Whole-Home Renovation FAQ

How much does it cost to renovate a whole house in the GTA?

Cosmetic refresh $40–$75/sq ft, mid-range $100–$160, gut renovation $180–$275+. A 2,000 sq ft detached: roughly $80K–$150K, $200K–$320K, or $360K+ respectively.

What should I renovate first?

Systems and structure, then kitchen and bathrooms, then flooring and paint last. Cosmetic work done before systems work gets destroyed and paid for twice.

How long does it take?

Main floor: 4–8 weeks. Whole home mid-range: 8–16 weeks. Gut renovation with structural changes: 4–6 months including permits.

How much contingency should I hold?

10–15%. Older GTA homes reveal wiring, plumbing and moisture surprises on demo day; the contingency keeps the schedule alive.

Is it cheaper to renovate all at once or in phases?

All at once, per square foot. Phasing means trades remobilize each time and finished areas need protecting from the next phase. Phase only if cash flow demands it.